| 1. | Base load base load is that portion of a building load demand which is constant . it is the " base " of the building demand curve 基本负荷基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。 |
| 2. | According to the required load characteristic of the power system or the owner ' s demand , the load demand of the hydroelectric plants group is proposed 摘要根据电力系统的负荷特性或业主的直接要求,提出对水电站群的负荷要求。 |
| 3. | The purpose of load demand controls is to reduce fuel consumption and limit problems caused by light load operation of reciprocating diesel generator sets 负载需求控制的目的是降低燃料的消耗量,减少往复式柴油发电机组因低负荷造成的故障。 |
| 4. | The problem becomes complicated through uncertain renewable energy supplies and load demand , non - linear characteristics of some components are interdependent 混合发电系统的优化问题由于可再生能源和负载需求的不确定性以及一些部件的非线性特性变得非常复杂。 |
| 5. | The technology of the code distribution , loading demand and key server is used to ensure the secure , rapid and high quality transmission of the active packages 同时,采用传统报文格式,通过主动节点对主动报文和被动报文进行区分,采取不同的处理方式,从而保证了与现有网络的兼容。 |
| 6. | Load demand is a paralleling system operating mode in which the system monitors the total kw output of the generator sets , and controls the number of operating sets as a function of the total load on the system 负载需求是并联系统的一种运行模式,系统监控发电机组总的输出功率,根据系统总负载量决定运行机组的数量。 |
| 7. | The regulation goal and its corresponding regulation method of the hydroelectric plants group are given by analyzing the water inflow characteristic and the load demand to meet the load demand as much as possible 分析水电站群的来水特性和负荷要求,在尽可能满足负荷要求的前提下确定水电站群的调度目标,并给出相应的调度方法。 |
| 8. | As the first pumped storaged power station in henan province , huilong project plays the role of regulating the peak and valley load demand in the power grid , which involves in complicated and frequent changing working conditions 摘要回龙电站是我省首座抽水蓄能电站,电站建成后以担负南阳地区电网调峰填谷为主要目标,工况变换复杂、频繁。 |
| 9. | The results indicate that the scheme obtained from the fuzzy model can meet more load demand than that obtained from the deterministic model with a slight declination in the cost of objective function , and has a strong suitability for the uncertain environment 结果表明,模糊优化规划模型与确定性优化模型相比,其规划方案能够在成本大体不变的情况下,满足更多的可能性负荷的需求,且对未来的不精细环境具有更强的适应性。 |
| 10. | From the above analyses , the conclusions can be made as followed : under the present load condition , suzhou urban mv / lv distribution power network should have the sustainability ; when the load increases by 20 % or 40 % , a few mv / lv lines will be unable to meet the load demand 从以上几个方面分析,得出“研究”的结论。即在当前负荷下,苏州城市中低压配电网应当具有承受的能力;而当负荷发展到1 . 2 、 1 . 4倍时,将有少部分中低压线路不满足负荷需求。 |